Skip to content

New Carpeting

Submitted by: Ms. Shelli Holt-Macey

New carpeting will be installed in the main area of the PAC beginning on Monday, Movember 21, and through the Thanksgiving break. The PAC will likely be unavailable/inaccessible starting sometime on 11/21 until 11/29. If you’d like to reserve a conference room, etc., during this time please let Mrs. Frail or Mrs. Rule know. In addition, there will be some new furniture added to the PAC that was unable to be used in our new care lab space.